
To be asked to provide a set for the very first major production to be performed in the first west-end theatre to be built in 50 years was quite the honour. Respected designer Rob Jones worked closely with us to realise his vision for this unique new space.
As with most theatres old and new, there were challenges and this in the round adaptation of the Shakespeare classic was no exception. However, our highly skilled team took all the new venue’s inevitable teething problems in their stride and with a couple of tonnes of custom steel truss work and timber moulding fabricated an absolutely breathtaking curved feature ceiling piece, a suspended forest of gnarled branches and an intricately engraved and painted show floor.

